|
An important feature of the
RISE system is the possibility
to add or remove cables in a
later stage without disassembling
the whole penetration.
It’s so simple. Just cut away
the layer of sealant at both
sides of the penetration in
a tapering shape. Pull the cable
through one of the empty sleeves.
If the empty sleeves are not
fitting to the size of the cable
to be ducted, a number of insert
sleeves must be removed.
Install a fitting insert sleeve
in the open space and pull the
cable through the fitting insert
sleeve that has now been installed.
Refill the openings cut in the
putty layer at both sides of
the penetration with FIWA sealant.
Press the sealant down firmly
and smooth it with a damp cloth.
If future extensions of the
cable set are expected, the
position of the future cables
is marked by means of FRR/HF
circular profiles. The profiles
are fitted with a RISE insert
sleeve.
Please refer to our brochure
for a step by step instruction
on adding or removing cables
in a RISE multi-cable penetration.
|